Decommissioning of former Nuclear Site

Caorso Nuclear Power Plant

Environmental remediation of the site through the removal of radioactive waste.

Piacenza, ITALY

2016 - ongoing

Z

Salc for SOGIN

€ 9,400,000.00

3TI is involved in the detailed design, shop-drawings, and as built design, for the demolition and the reconstruction of 2 nuclear depots ERBA 1 and 2 dedicated to low radioactive wastes in Caorso Nuclear Power Plants. Developed in a contaminated area, the project’s aim is to depollute the site environment, remove the existing structures, and propose an efficient management for the residual radioactive waste.