News, January 25, 2024

Back through time | E90 Highway

Back through time | E90 Highway

Today we go back to 2003 with our ‘back through time series’ and a very massive project as the E90 Highway: S.S. 106 Jonica and extension of the S.S. 280 “Dei due Mari” – Lot 1-2, where we have provided to ANAS SpA the final design and environmental impact assessment of this particularly project which involved the stretch of road between Squillace (km 178+350) and Simeri Cricchi (km 191+500) – lots 1-2-3-4 -5 and extension of SS 280 ending at the junction with the SS 106 lots 1-2.

This Standard “Type B” Road was designed for speeds of 70-120 km/h, for a length respectively of: State Road SS 106 Jonica: 17+200 Km; State Road SS 280 “Dei due Mari”: 5+220 Km. The passage of the SS 106 through a mountainous region required the design of some 13 bridges and viaducts, 10 natural tunnels, and one artificial tunnel (approximately 50% of this stretch runs in tunnels). The SS 280 “Dei due Mari” runs along the left bank of the Corace River and its alignment is completely embanked.

Very proud to have been part of this program of improvements of the National Road System in Calabria!

#3tiprogetti#importantprojects#infrastructure#roads#backthroughtime