News, December 28, 2018

Bridge over Tagliamento river opened before Christmas

Bridge over Tagliamento river opened before Christmas

The new Bridge over the Tagliamento River was opened to traffic before Christmas!  The construction has been made in 379 days basing on the project carried out by 3TI PROGETTI as member of the JV which has developed the final and detailed design of this prestigious infrastructure.

https://lnkd.in/gah6ae9