Expanding an airport while keeping it fully operational
At Catania Fontanarossa Airport, two projects respond to different but closely connected needs within Terminal A: increasing capacity, improving passenger flows and upgrading spaces and services for both Schengen and Extra-Schengen operations.
On the airside façade, the project adds approximately 2,800 sqm of new space serving 10 boarding gates. Four new volumes, projecting approximately 14.6 metres over the service road below, will expand the Schengen boarding areas while allowing passenger flows, commercial spaces and Extra-Schengen border control areas to be reorganised.
A second intervention focuses specifically on the Extra-Schengen areas, adding more than 1,300 sqm of operational space and redesigning passport control to address existing capacity constraints and improve passenger processing. The project includes the vertical extension of Building E, structural strengthening with carbon-fibre systems and a new mezzanine level dedicated to passenger services.
The technical challenge lies not only in expanding the terminal, but in doing so without compromising airport operations. Both interventions are conceived through phased construction strategies, combining structural works with new building services, accessibility improvements and energy-efficiency measures while maintaining the continuity of airport activities.
3TI Progetti, as lead consultant within the RTP with Architecna Engineering s.r.l., Servizi Integrati S.R.L and Cascone Engineering, developed the design for SAC Società Aeroporto Catania.
Two interventions, one objective: adapting existing airport infrastructure to growing passenger demand through greater capacity, operational efficiency and accessibility.