Works supervision for “Struma Highway Lot 3.2.1, Section “Krupnik – Kresna” – Left Lane from km 375 + 860=376 + 000 from Lot 3.1 of Struma Motorway to km 389 + 100 and Road Connections
3TI Progetti, in JV with PS Consult EOOD and KONTPAS EOOD, signed the contract with Road Executive Agency for the Works supervision of Struma Highway: Lot 3.2.1, Section “Krupnik – Kresna” from km 375 + 860 of Lot 3.1 of Struma Motorway to km 389 + 100 and Road Connections.
The section runs through a challenging mountainous terrain and is dominated by a tunneled route – between Krupnik and Kresna cities – including:
– 3 junctions in Poleto, Mechkul, Stara Kresna;
– 11 viaducts;
– 4 tunnels.
3TI Progetti is in charge of works supervision of this motorway project, for a total length of around 13 km.
Location
Bulgaria
Client
Bulgarian Road Infrastructure Agency
Year
2023 - on going
Partner
PS Consult EOOD - KONTPAS EOOD