News, February 2, 2024

Railway section Sighisoara – Coslariu

Railway section Sighisoara – Coslariu

3TI Progetti is very proud to announce that works supervision of the rehabilitation of the railway section Sighisoara – Coslariu, part of Simeria-Brasov Railway (#paneuropeancorridor IV), strategic project which ensures the movement of trains with a speed of 160 km/h – ended up.

The Sighisoara – Coslariu section covers a total distance of approximately 92 km, and the main goals achieved are:
– hydraulic piping and replacement of the reinforcements on all the lines;
– the construction of 33 new bridges/viaducts;
– 2 tunnels (401 m and 969 m long);
– approximately 8 km of support works;
– over 100 manholes;
– the rehabilitation of some bridges, stations and the existing stops;
– installation of the ERTMS signalling system (ETCS level 2 + GSMR).