D&B Metro Line 6 – Lot 1.2: Tokyo – Airport Henri Coanda Otopeni
The project consists in the design and construction of Bucharest Metro M6 Line, Lot 1.2 from Tokyo located next to the southern road access in Baneasa Shopping Complex up to Otopeni Airport station located in the parking area in front of Otopeni Airport.
The M6 line has a strategic role and will serve the northern area of Bucharest (district 1) and the city of Otopeni. The project will benefit both Bucharest and Otopeni areas/district.
Lot 1.2 starts from Tokyo station, which is the last station of Lot 1.1; the route is around 7.6 kms and includes 6 stations: Washington, Paris, Bruxelles, Otopeni, Ion I.C: Bratianu, Aeroportul Otopeni.
3TI Progetti is in charge of the concept design, technical execution project including the technical documentation to obtain the construction permit and technical assistance during construction of works.